You are only required to complete the training lessons provided by your instructor via email. Please select the training lesson from the list in the left sidebar.
Each exam requires a passing grade for completion. If you do not pass the exam, please watch the video again and retake the exam.
If you have any questions about the exam or have technical issues, please contact Donny Prater.
0 of 10 Questions completed
Questions:
You have already completed the exam before. Hence you can not start it again.
Exam is loading…
You must sign in or sign up to start the exam.
You must first complete the following:
0 of 10 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
1. In the Neal Plant the primary purpose of a Nitrogen System is to provide a source of inert, non-combustible gas for purging operating equipment.
2. Other uses for Nitrogen at the Neal Plant include: (Select All That Apply)
3. Nitrogen at high concentrations (>78%), such as in confined or poorly ventilated areas, can cause asphyxiation and death.
4. Any atmosphere which does not contain at least ______% oxygen for breathing can cause dizziness, unconsciousness or even death.
5. All Hoses used for Nitrogen Service shall be color coded ___________ and hard piping for Nitrogen distribution is color coded _____________.
6. Liquid Nitrogen is extremely hot. Accidental contact of liquid or gas with the skin can cause a severe thermal burn.
7. Special couplings are dedicated for Nitrogen service only. Changing out couplings or fabricating coupling adapters is strictly prohibited.
8. “Danger – Nitrogen” barricade tape shall be used to warn employees of the “Nitrogen Purge Area Boundary”.
9. _________________ hazard warning signs are posted at open applicable man-ways during a nitrogen purge.
10. If any of the standard pre-cautionary measures identified in the Neal Nitrogen Safety Standard cannot be achieved then entry into the nitrogen purge area requires a Pre-Plan to be completed