You are only required to complete the training lessons provided by your instructor via email. Please select the training lesson from the list in the left sidebar.
Each exam requires a passing grade for completion. If you do not pass the exam, please watch the video again and retake the exam.
If you have any questions about the exam or have technical issues, please contact Donny Prater.
0 of 10 Questions completed
Questions:
You have already completed the exam before. Hence you can not start it again.
Exam is loading…
You must sign in or sign up to start the exam.
You must first complete the following:
0 of 10 Questions answered correctly
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
1. The Contract Service Provider, prior to the start of each new task involving a potentially hazardous environment or involving the generation of waste materials covered under Neal Plant operating permits, must conduct a pre-task HES review.
2. Select items of primary concerns associated with SPCC (Select All That Apply)
3. The main thrust of the SPCC regulations is prevention as opposed to after-the-fact reactive measures commonly described in Spill Contingency Plan.
4. Activities such as drum crushing, contaminated equipment cleaning, handling of contaminated soils, etc are to be done on/in a contained area to prevent run off into ditches or streams.
5. Contractors should have plans to provide emergency response provisions, such as spill control equipment, that are readily available to their employees in case an incident occurs directly associated with the tasks they are performing.
6. To report an emergency dial _______.
7. Good housekeeping practices can greatly reduce the risk of spilling oil to the environment.
8. Vehicles and equipment should be inspected and maintained to prevent leaks.
9. All Universal Waste must be placed inside building ____ which is specifically designated and labeled for “Universal Waste Storage”